PumpGard PGXPR Series

Field Proven PumpGard™ Products Yield a Quick ROI
An Example of Success - In early 1990, a major operator was experiencing repeated pump failure due to sand cut and gas lock. The existence of abrasive conditions from both sand and formation abrasives caused two problems: First, the need to set the pump 15' above the perforations in an attempt to reduce abrasive action and second, pump failure was occurring every 37 days. PumpGard™ was installed and 310 days later, no service had been required. Additionally, the pump was lowered to a closer proximity to the perforations, resulting in increased production.
Over this period, PumpGard™ produced minimum saving of $8600 per year, avoided at least 8 well pullings (and the lost production associated with it) and avoided the expense of 8 Pump Repairs.
The PumpGard Payout = 60 Day
See PumpGard PGXPR Series Product sheet for Rod Pumps
PGXPR Bound for Australia
Stren SC2000 XPR
SC2000 XPR completion screens provide a clean, sand-free wellbore for increased production flow and pump intake protection. Meeting or exceeding all other industry products, our inflow surface area ranges to 60 percent + compared with wire-wrapped screens or sand pre-packs at 3 to 9 percent.

“If you let sand get into your pump, you have a fight on your hands.”